Manylion am Gais Rheoli Adeiladau ar gyfer 2024/0321/BR
- Rheoliadau Adeiladu Rhif
- 2024/0321/BR
- Math y Cais
- Building Regulations-Full Plan
- Cyf Cynllunio
- -
- Penderfyniad
- Approved Conditionally
- Lleoliad
- St. Athan Primary School, Rock Road, St. Athan. CF62 4PG
- Dyddiad Dechrau
- -
- Dyddiad Penderfynu
- 02/07/2024
- Dyddiad Cwblhau
- -
- Dyddiad Dilys
- 26/06/2024
- Cynnig
- Proposed internal works to create secure lobby area
- Penderfyniad
- Approved Conditionally
- Dyddiad Penderfynu
- 02/07/2024
Cod | Manylion yr Amod |
---|---|
ns | Non Standard |
ns | Provide commissioning certificates for the electrical modifications. |
ns | Non Standard |
ns | Non Standard |
ns | Non Standard |
ns | Non Standard |
ns | The plans have been forwarded for consideration by the Chief Fire officer and I will inform you as quickly as possible of any revisions and/or additional information that may be required. |
ns | Confirm current fire strategy for the building and how the front exit door is used in relation to means of escape. Confirm that new smaller exit door does not reduce the number of people escaping from the building. |
ns | If new reception is on fire escape route then the fire load needs to be limited in this area. |
ns | Confirm if any door entry equipment is proposed, meets the fire escape criteria for the building |
ns | Confirm details for firestopping of any ductwork passing through the new wall |
ns | Please confirm the new wall is non-loadbearing. |
ns | Specify the finishes of the surfaces of the walls and ceilings regarding the surface spread of flame classification. |
ns | The elements of structure require to be protected to achieve a minimum one-hour fire resistance. |
ns | The wall is to be 30 minutes fire resistance and taken to the underside of the floor deck and fire stopped. |
ns | Confirm existing of the AFD, exit signage, and emergency lighting design and how this is to be extending into this area. |
ns | Confirm details of sprinkler protection to this area |
Enw'r ffeil | Dyddiad a grëwyd | |
---|---|---|
Building Control Documents | ||
Decision Notice PDF | 02/07/2024 |