The development hereby permitted shall be begun before the expiration of five years from the date of this permission.
Reason:
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
NSA
Within two weeks of the commencement of the first drilling operations a full noise survey shall be undertaken at all the nearest identified noise sensitive residential and commercial properties, as well as the bat roost to the west of the site, to ensure compliance with the details set out in condit...
NS
No operations authorised by this permission, with the exception of the site restoration works set out in Section 8.17 of the supporting statement submitted with the application, shall take place after a period of ten weeks following the commencement of drilling operations on the site, unless otherwi...
NS
The drill rig and all other items of plant and equipment to be used in the drilling operations hereby approved shall each have a typical noise level at 1 metre not exceeding 79 dB(A).
Reason:
In order to protect local amenity in accordance with Policy ENV29 of the Unitary Development Plan.
NS
No operations authorised by this permission shall take place until details of a scheme to mitigate noise impacts at the nearest residential and commercial properties, as well as the bat roost to the west of the site, has been submitted to and approved in writing by the Local Planning Authority. All...
NS
Notwithstanding the submitted documents, prior to any drilling taking place, a detailed working method statement for the drilling operation, to include methods to minimise the risk of the loss of drilling fluid to ground water resources during the drilling process and monitoring for any loss of dril...
NS
Monitoring and assessment of vibration from the operations shall be carried out in accordance with the vibration methodology below unless otherwise agreed in writing with the Local Planning Authority.
i) An acceptable datum level of vibration will be agreed with the Local Planning Authority prior...
NS
Within three months of the completion of drilling and testing operations, all plant, machinery, buildings and the bund compound shall be removed from the site and the site shall be restored in accordance with the details set out in Section 8.17 of the statement entitled Accompanying information subm...
NS
The works to prepare the site for drilling, construct and dismantle the drill and equipment, and restore the site shall not take place outside the hours of 08:00 to 18:00.
Reason:
In the interests of the amenity of the area and to meet the objectives of Policies MIN1 and ENV27 of the Unitary D...
NS
Any lighting shall be in accordance with details previously submitted to and approved in writing by the Local Planning Authority.
Reason:
In the interests of the amenity of the area and to meet the objectives of Policies MIN1 and ENV27 of the Unitary Development Plan.
ns
Notwithstanding the submitted documents, prior to any drilling taking place on the site, a detailed working method statement/construction environmental management plan shall be submitted in writing to and approved by the Local Planning Authority, and all operations shall thereafter be carried out in...
AA060
Any facilities for the storage of oils, fuels and chemicals shall be sited on impervious bases and surrounded by impervious bund walls. The size of the bunded compound shall be at least equivalent to the capacity of the tank plus 10%. If there is a multiple tankage, the compound should be at least...
AA057
Full details of a scheme for the disposal of foul and surface water drainage shall be submitted to and approved in writing by the Local Planning Authority and the approved scheme shall be fully implemented in accordance with the approved details prior to any drilling operations or site preparation t...
ns
Prior to any drilling operations taking place, a scheme for the treatment, storage and disposal of any dust created by the operation shall be submitted in writing to and approved by the Local Planning Authority and the approved scheme shall thereafter be retained in operation throughout any periods ...
ns
Vehicular access to the site shall only be made in accordance with Section 7.6 of the supporting information and, in particular heavy traffic (such as the rig, drill pipe and cabins) shall approach and leave the site only from / to the south via the A4050, A4226 and B4265 to avoid Llandow Village.
...
AA103
Prior to the commencement of development details of measures for wheel washing and dust suppression shall be submitted to and approved in writing by the Local Planning Authority and the approved measures shall be fully implemented on site prior to the commencement of any works and shall thereafter b...
Name
Date Sent
Type
Expiry Date
Councils Drainage Section
05/01/2015
Demolition
-
Councils Drainage Section
05/01/2015
Discharge
-
Dwr Cymru Welsh Water,
17/12/2014
Consult
-
Dwr Cymru Welsh Water,
05/01/2015
Demolition
-
Dwr Cymru Welsh Water,
05/01/2015
Discharge
-
Dwr Cymru Welsh Water,
22/04/2013
Consult
-
Ecology Officer
22/04/2013
Consult
-
Highway Development,
22/04/2013
Consult
-
Highway Development,
05/01/2015
Demolition
-
Highway Development,
05/01/2015
Discharge
-
Llandow Community Council
22/04/2013
Consult
-
Llandow Community Council
09/10/2013
Information
-
Llandow-EwennyWd1 OBSOLETE
22/04/2013
Consult
-
Natural Resources Wales,
22/04/2013
Consult
-
Natural Resources Wales,
05/01/2015
Demolition
-
Natural Resources Wales,
05/01/2015
Discharge
-
Natural Resources Wales,
17/12/2014
Consult
-
Shared Regulatory Services (Pollution)
05/01/2015
Demolition
-
Shared Regulatory Services (Pollution)
05/01/2015
Discharge
-
Shared Regulatory Services (Pollution)
17/12/2014
Demolition
-
Shared Regulatory Services (Pollution)
17/12/2014
Discharge
-
Shared Regulatory Services (Pollution)
22/04/2013
Consult
-
Address
Date Sent
Reconsult Date
Expiry Date
Site visit letter to agent
-
-
-
by email
-
-
-
by email
-
-
-
Cowbridge and Llanblethian Residents Group.
2 Darren Close
Cowbridge
CF71 7DE
-
-
-
Grove Farmhouse,
off Sutton Road,
Llandow
CF71 7PA
-
-
-
5 Court Close
CF61 1FA
-
-
-
by email
-
-
-
by email
-
-
-
by email
-
-
-
Morfa Farm
Morfa Lane
Llantwit Major
CF61 2YT
-
-
-
by email
-
-
-
by email
-
-
-
UNIT 34A
TUMULUS WAY
LLANDOW TRADING ESTATE
LLANDOW
COWBRIDGE
CF71 7PB
22/04/2013
-
13/05/2013
ARMADA ENGINEERING LTD
UNIT 36
TUMULUS WAY
LLANDOW TRADING ESTATE
LLANDOW
COWBRIDGE
CF71 7PB
2011/00812/FUL : Unit 1, Llandow Industrial Estate, Llandow - Drill and test the insitu lower limestone and associated strata for the presence of gas - Refused 21/10/2011. allowed on appeal.
2011/00115/FUL : Unit 1, Llandow Industrial Estate, Cowbridge - Drill and test the insitu lower limestone shale and associated strata - W -12/04/2011 (case officer - ML)
2001/01038/FUL : Unit 1, Llandow Industrial Estate, Llandow - Erection of precast concrete casting facility with batching plant, offices and stores. Full hardstanding for stacking/trafficking - A -23/11/2001 (case officer - ML)