Welcome to the
Vale of Glamorgan Council

Building Control Application details for 2014/0830/BR



Building Regs No.
2014/0830/BR
Application Type
Building Regulations-Full Plan
Planning Ref
2014/01023/FUL
Decision
Approved Conditionally
Location
6, Badgers Brook Close, Ystradowen
Commencement Date
06/11/2015
Decision Date
05/12/2014
Completion Date
25/09/2017
Valid Date
02/12/2014
Proposal
Single storey extension to provide an additional bedroom and en-suite
Decision
Approved Conditionally
Decision Date
05/12/2014

Code Condition Details
ns Following examination of your submitted drawings and inspection of the map of sewers, it would appear that the proposal will be built over or within 3 metres of a public drain/sewer or the statutory undertaker.
ns The minimum U value for the extension floor element is 0.18W/m2K. Increase the insulation thickness or provide a U value calculation.
ns Consequential improvements are required to the existing dwelling. These could have an effect on the existing property and must be adhered to. Firstly note the comments in AD L1B(Wales) Section 4, page 15. For details on 'consequential improvement measures' see the following references: Extensions less than 10m2 refer to pages 15 & 16, paras 4.2.1 & 4.2.4. For extensios over 10m2 refer to pages 15 & 16 paras 4.2.2 & 4.2.4 Please provide details of you proposals to meet the criteria. To access the document please go to:- http://wales.gov.uk/topics/planning/?lang=en
ns The proposed windows, roof windows and rooflights in the extension are to have a U value of 1.6 W/m2K, or a window energy rating Band D, or a centre pane U value of 1.2 Wm2K.
ns The proposed doors with more than 50% glazing in the extension are to have a U value of 1.6W/m2K minimum.
ns The minimum U value for the extension wall element is 0.21 W/m2K. Increase the insulation thickness or provide a U value calculation.
ns The minimum U value for the extension pitched roof - insulation at ceiling level is 0.15W/m2K. Increase the insulation thickness or provide a U value calculation.
ns Provide manufacturers calculations and details for the proposed roof trusses.
ns The proposal has been identified as being in an area which may be affected by Radon. Once the work has been completed it is advisable that the property is tested in accordance with National Radiological Protection Board's recommendations. Any cracks in the floor slab, walls, or at service entries are to be suitably sealed with flexible sealers. A radon tray is to be provided at GF dpc level.
ns The ventilation extract rate to the proposed shower room is to be 15 l/s. Minimum high rage to be 8l/s.
ns Provide a lintel schedule.
  File name Created date
Building Control Documents
You are here:  
Vale of Glamorgan Council, Civic Offices, Holton Road, Barry CF63 4RU, Tel: (01446) 700111