Building Control Application details for 2014/0564/BR
- Building Regs No.
- 2014/0564/BR
- Application Type
- Building Regulations-Full Plan
- Planning Ref
- 2014/00921/FUL
- Decision
- Approved Conditionally
- Location
- 53, Heol Y Frenhines, Dinas Powys
- Commencement Date
- 12/11/2014
- Decision Date
- 12/08/2014
- Completion Date
- 29/04/2015
- Valid Date
- 30/07/2014
- Proposal
- Extension & loft conversion
- Decision
- Approved Conditionally
- Decision Date
- 12/08/2014
Code | Condition Details |
---|---|
ns | Structural calculations & details are required to be deposited for the steelwork at GF, FF & SF. |
ns | Provide details of the proposed first floor & roof joist construction. |
ns | Following examination of your submitted drawings and inspection of the map of sewers, it would appear that the proposal will be built over or within 3 metres of a public drain/sewer. You are therefore required to consult with the owner of the drain/sewer or the statutory undertaker. |
ns | Provide interlinked smoke detectors with battery backup where new habitable rooms are created in the existing hall/landing & a heat detector in the kitchen. |
ns | The doors to all habitable rooms on the ground & first storey should be the fire resisting type doors with a 20 minute integrity rating to British Standard 476: Part 8: 1972 as amended (FD20 type). |
ns | The proposed porch is exempt Building Regulations. |
ns | Provide installation and test certificates for the gas appliance. |
ns | The proposal has been identified as being in an area which may be affected by Radon. Once the work has been completed it is advisable that the property is tested in accordance with National Radiological Protection Board's recommendations. Any cracks in the floor slab, walls, or at service entries are to be suitable sealed with flexible sealers. A radon tray is to be provided at GF dpc level. |
ns | The elements of structure require to be protected so as to achieve a minimum of half an hour fire resistance. |
ns | The cavities in the external wall must be effectively sealed at roof level. |
File name | Created date | |
---|---|---|
Building Control Documents | ||
Decision Notice | 15/08/2014 | |
Comp Cert | 29/04/2015 |