Building Control Application details for 2014/0505/BR
- Building Regs No.
- 2014/0505/BR
- Application Type
- Building Regulations-Full Plan
- Planning Ref
- 2014/00825/FUL
- Decision
- Approved Conditionally
- Location
- Coach House, Rear of 85, Glebe Street, Penarth. Now know as: 47 Salop Place, CF64 1HP
- Commencement Date
- 28/08/2014
- Decision Date
- 25/07/2014
- Completion Date
- 14/09/2015
- Valid Date
- 17/07/2014
- Proposal
- New staircase in place of existing, re organise floor plan to suite. New fire alarm/detection system & fire doors
- Decision
- Approved Conditionally
- Decision Date
- 25/07/2014
Code | Condition Details |
---|---|
ns | The stairway and landing should have headroom of at least two metres measured vertically from the pitch line. |
ns | Consecutive tapered treads must have a uniform going. |
ns | The tapered treads must have a minimum going of 50mm. |
ns | Provide detail of the proposed stair trimming. |
ns | Specify the construction of the first floor with regard to the resistance to both impact and airborne sound. |
ns | Provide a layout plan showing the full details of the drainage system including runs, falls, invert levels, access and ventilation. Full details of manhole construction and size and flow rate calculations are also required. |
ns | Specify the full details of the proposed heating appliances to be installed in the building. |
ns | The proposed electrical installation is to be installed by a competent person registered under the Governments competent person scheme. Either, BRE Certification Ltd, BSI, ELECSA Ltd, NAPIT Certification Ltd or NICEIC Certifications Services Ltd. |
ns | Installation and testing certificates are to be provided for the electrical installation. Copies of these certificates are to be provided to the Building Control Department for their records. |
ns | Provide installation and test certificates for the gas appliance. |
ns | The proposed store door in the stair enclosure is to be FD20. |
ns | Indicate the exit route from the yard. |
ns | The proposed new external blockwork is to be cavity construction with the appropriate U value and dpcs. |
ns | Provide interlinked smoke detectors with battery backup where new habitable rooms are created in the existing hall, landing & a heat detector in the kitchen. |
File name | Created date | |
---|---|---|
Building Control Documents | ||
Comp Cert | 14/09/2015 | |
Decision Notice | 29/07/2014 |