NS |
This planning permission shall expire on 31st December 2057.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026. |
NS |
Following the expiry of the planning permission, all extraction, treatment, and stockpiling of minerals shall cease.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026.
|
NS |
No later than 12 months following the expiry of the planning permission, or the earlier permanent cessation of winning and working of minerals, as agreed between the mineral operator and MPA, all plant, machinery and structures shall be dismantled and removed from the site.
Reason: To comply with... |
NS |
No later than 12 months following the expiry of the planning permission, or the earlier permanent cessation of winning and working of minerals, as agreed by both the mineral operator and MPA, the sale and transportation of minerals from the site shall cease.
Reason: To comply with Policies MD1, M... |
NS |
No development or phase of development shall commence until a timetable for the phasing of works has been submitted to and approved in writing by the MPA. The timetable, and any arising revisions, shall be implemented as approved.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the... |
NS |
The winning and working of stone and disposal of overburden/quarry waste shall be carried out in accordance with the quarry development plan ref numbers R337-00009-3A, 7C, 8C and 9B. The approved quarry development scheme shall be updated at 5-year intervals from the date of commencement of quarryin... |
NS |
The site access shall be surfaced in permanent materials, and the surface maintained in a good state of repair and kept free of mud/debris.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026.
|
NS |
Temporary Operations (meaning operations associated with soil and overburden stripping, construction of soil storage mounds, construction of site haul roads, construction of soil baffle mounds, and restoration works involving the use of machinery) shall only be carried out between 08:00 – 18:00 hour... |
NS |
9. Except in emergencies or as may be otherwise agreed in writing with the Mineral Planning Authority:
(a) No operations other than maintenance shall be carried out except between the following times:
07:00 to 19:00 Mondays to Fridays; and
07:00 to 13:00 Saturdays.
(b) No servicing, maintena... |
NS |
No quarrying shall take place below 39m AOD, and quarrying operations shall proceed with no dewatering of the excavation by pumping, and with no ‘wet working’ of mineral.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026. |
NS |
Groundwater monitoring shall recommence at least 6 months prior to the commencement of quarrying operations, with monthly level monitoring to be undertaken at boreholes RBH01, RBH02, RBH05B, GBH03, GBH05, GBH08 and GBH09. Additionally, the location and dates when groundwater rises into the active ex... |
NS |
Any facilities for storage of oils, fuels or chemicals on the site shall be sited in impervious bases and surrounded by impervious bund walls. The volume of the bunded compound shall be at least equivalent to the capacity of the tank plus 10%. If there is multiple tankage, the compound shall be at l... |
NS |
13. To minimise the risk of groundwater pollution from quarrying and processing operations, the development shall be carried out in accordance with the following requirements:
•All fuel and chemicals should be stored in bunded areas
•Drip trays should be appropriately placed under all relevant pl... |
NS |
Prior to the commencement of quarrying operations, the preliminary works associated with the Habitat Creation Area shown on plan R337-00009-19A shall be fully implemented to the satisfaction of the MPA, based upon the principles set out in section 6.4.7 of the Supplementary Environmental Statement. ... |
NS |
15. No development or phase of development shall commence until a Landscape Ecological Management Plan (LEMP) for the provision, management and maintenance of the landscape and ecological features at Ruthin Quarry for all phases of the development has been submitted to and approved by the MPA. The L... |
NS |
A written report of the effectiveness of the LEMP shall be submitted to and approved in writing by the MPA at the conclusion of every development phase, commencing with the preliminary works phase, and every 5 years during those phases. The report shall include a revised LEMP (as appropriate) which ... |
NS |
No blasting within 250m of Building B (located within Ruthin Quarry) shall occur in either Ruthin or Garwa quarry during the bat maternity season (May – August inclusive).
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026... |
NS |
Prior to development commencing on site, a detailed scheme for the simultaneous monitoring of buildings B and D for use by horseshoe bats, along with potential flight routes between the two buildings, shall be submitted to and approved in writing by the MPA.
The scheme shall cover a two year period... |
NS |
Bat surveys of trees and quarry faces shall be undertaken prior to the commencement of each operational quarry phase and at 5 yearly intervals thereafter for each operational phase longer than 5 years. A written report of each survey shall be submitted to MPA following completion of monitoring in ea... |
NS |
Prior to development commencing on site and, thereafter prior to each subsequent phase of the development, an invasive non native species (INNS) control strategy (and thereafter revised strategies) shall be submitted to and approved in writing by the MPA. The strategy shall:
• Include fish, and inv... |
NS |
A written report of the effectiveness of the INNS Control Strategy shall be submitted to and approved in writing by the Local Planning Authority at the conclusion of every development phase, commencing with the preliminary works phase, and every 5 years during those phases. The report shall include ... |
NS |
Prior to the commencement of quarrying operations, a Reptile Mitigation Strategy shall be submitted to and approved in writing by of the MPA. The Strategy shall be based upon the mitigation principles set out in section 6.4.8 of the Supplementary Environmental Statement and shall include details of ... |
NS |
Prior to the re-commencement of quarrying operations following the grant of this permission/consent, a scheme shall be submitted to the MPA for their approval setting out proposals for additional tree planting and strengthening of hedgerows around Ruthin Quarry. The scheme shall include proposals fo... |
NS |
Prior to the re-commencement of quarrying operations following the grant of this permission/consent, a scheme shall be submitted to the MPA for their approval setting out proposals for the construction of a 3.0m high screening bund along the western boundary of the IDO area. The scheme should includ... |
NS |
Prior to the re-commencement of quarrying operations following the grant of this permission/consent, scheme shall be submitted to the MPA for their approval in writing, setting out proposals for the intermediate restoration of the upper faces/benches of the north eastern area of Ruthin Quarry, as il... |
NS |
Except for Temporary Operations, the free-field Equivalent Continuous Noise Level, LAeq,1 hour due to operations in the site, shall not exceed the relevant criterion limit specified in Schedule 1 at each nominated dwelling for the periods specified. Measurements taken to verify compliance shall have... |
NS |
Prior to the re-commencement of quarry operations, a Noise Management Plan (NMP) shall be submitted to and approved in writing by the MPA, to include details of timings for reviews of the NMP. The NMP shall include details of ‘supervised monitoring’ of noise, as advised by MTAN1, noting guidance cur... |
NS |
For Temporary Operations the free-field noise level due to work at the nearest point to each dwelling shall not exceed 67 dB LAeq, 1 hour. Temporary Operations shall not exceed a total of eight weeks in any calendar year.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of ... |
NS |
Except with the written consent of the MPA, or in the case of emergency, blasting operations shall be carried out only between 10:00 and 17:00 hours Monday to Friday, and only in exceptional circumstances on Saturday (subject to prior written approval) and not at all on Sunday and Public/Bank Holida... |
NS |
Ground vibration as a result of blasting shall not exceed a peak particle velocity of 6mms-1 in 95% of all blasts measured over any six month period, and no individual blast shall exceed a peak particle velocity of 10mms-1 measured at any vibration sensitive location, which is defined as any residen... |
NS |
All individual blasts shall be designed, managed and implemented to minimise the extent of air overpressure resulting from blasts, having regard to blast design, methods of initiation of blasts, and also as far as practicable to weather conditions prevailing at the time of initiation.
Reason: To ... |
NS |
Each individual blast shall be monitored by the Operators, to include provision for recording the details and location of the monitoring station; the location of the blast holes within the site; weather conditions; specification of the blast in terms of MIC; and total charge weight. Blast monitoring... |
NS |
Blasting times shall be clearly advertised at the Quarry site entrance, and an audible warning shall be sounded prior to any blasting operations taking place and shall be sounded again immediately after blasting has finished.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale... |
NS |
There shall be no secondary breakage of stone by the use of explosives.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026. |
NS |
Prior to the recommencement of quarrying operations following the grant of this permission/consent, a dust management plan shall be submitted to and approved in writing by the MPA which shall contain measures to minimise dust escape, monitoring of dust at local receptors, to include Llangan Primary ... |
NS |
Except in the case of emergency, the main access to the site shall be as shown on the submitted plan 32256-HYD-ZZ-00-SK-C-0100 P02.
Reason: To comply with Policies MD1, MD2, MD7, SP9 and MG25 of the Vale of Glamorgan Adopted Local development Plan 2011-2026.
|
NS |
Details of the design and location of a wheel wash facility shall be submitted to and approved in writing by the MPA prior to the resumption of quarrying. The submitted details shall include a timescale for the installation of the wheel wash, and following approval of the details, the wheelwash shal... |
NS |
Prior to the recommencement of operations a Site Management Plan shall be submitted to and approved in writing by the Mineral Planning Authority. The approved plan shall be adhered to through the construction phase and whilst the quarry is in operation. The plan shall provide for:
(i) The parking o... |
NS |
Notwithstanding the submitted Plans (32256-HYD-ZZ-00-SK-C-0100 P02, 32256-HYD-ZZ-00-SK-C-0101 P02, and 32256-HYD-ZZ-00-SK-C-0102 P02), full engineering details of the proposed access points, improvements along the main access route to the quarries (including widening/lay bys and surfacing), visibili... |
NS |
Prior to the commencement of soil stripping operations, a Soil and Overburden Management Plan shall be submitted to and approved by the MPA. After the date of its approval all operations shall be carried out in accordance with the approved Soil and Overburden Management Plan. The Soil and Overburden... |
NS |
Prior to any soil stripping the applicant, or their agents or successors in title, has secured agreement for a written scheme of historic environment mitigation which has been submitted by the applicant and approved by the local planning authority. Thereafter, the programme of work will be fully car... |
NS |
The development shall proceed in a way which facilitates the implementation of the concept restoration illustrated on application plan ref R337-00009-12B and the details of interim and final restoration treatments, landscaping, and aftercare, set out in Chapter 3.0 of the Supplementary Environmental... |
NS |
Not later than 31st December 2057, or the expiry of six months following the permanent cessation of the winning and working of minerals, whichever is the sooner, the Operator shall submit for the written approval of the MPA, a detailed final restoration scheme, including drawings to illustrate the p... |
NS |
Not later than 31st December 2057, or the expiry of six months following the permanent cessation of the winning and working of minerals, whichever is the sooner, the Operator shall submit for the written approval of the MPA, a detailed aftercare management plan. The management plan shall be in subst... |
NS |
Prior to the recommencement of quarrying operations following the grant of this permission/consent, details of a Stakeholder Engagement Meeting shall be submitted to and approved in writing by the MPA. This shall comprise details of a programme of stakeholder engagement through the lifetime of the c... |
NS |
The development shall be carried out in accordance with the following approved plans and documents:
32256-HYD-ZZ-00-SK-C-0100 P02
32256-HYD-ZZ-00-SK-C-0101 P02
32256-HYD-ZZ-00-SK-C-0102 P02
R337-00009-01
R337-00009-02
R337-00009-3A
R337-00009-7C
R337-00009-8C
R337-00009-9B
R337-00009-1... |
NSA |
Prior to the re-commencement of quarrying operations, further details of the permitted timings of HGVs exiting the site to travel in a southerly direction past Llangan Primary School shall be submitted to and approved in writing by the Minerals Planning Authority. The development shall thereafter be... |
II046 |
New developments of more than one dwelling or where the area covered by construction work equals or exceeds 100 square metres as defined by The Flood and Water Management Act 2010 (Schedule 3), will require SuDS Approval Body (SAB) approval prior to the commencement of construction.
Further info... |