Manylion am Gais Rheoli Adeiladau ar gyfer 2015/0623/BR
- Rheoliadau Adeiladu Rhif
- 2015/0623/BR
- Math y Cais
- Building Regulations-Full Plan
- Cyf Cynllunio
- 2015/00169/FUL
- Penderfyniad
- Approved Conditionally
- Lleoliad
- 9, Crescent Close, Cowbridge
- Dyddiad Dechrau
- 26/08/2015
- Dyddiad Penderfynu
- 30/07/2015
- Dyddiad Cwblhau
- 14/10/2016
- Dyddiad Dilys
- 09/06/2015
- Cynnig
- 2 storey extension
- Penderfyniad
- Approved Conditionally
- Dyddiad Penderfynu
- 30/07/2015
Cod | Manylion yr Amod |
---|---|
ns | It has been assumed that the structural calculations deposited with your application have been designed and verified by a qualified Structural Engineer. On this basis the design has been accepted. |
ns | Provide floor layouts of each level and the use of all rooms. |
ns | Consequential improvements are required to the existing dwelling. These could have an effect on the existing property and must be adhered to. Firstly note the comment in AD L1B effect on the existing property and must be adhered to. Firstly note the comment in AD L1B (Wales) Section 4, page 15. for details on 'consequential improvement measures' see the following references: Extensions less than 10m2 refer to pages 15 & 16, paras 15 & 16, paras 4.2.1 & 4.2.4. For extensions over 10m2 refer to pages 15 & 16 paras 4.2.2 & 4.2.4. Please provide details of you proposals to meet the criteria. |
ns | The proposed ceiling joists are over spanned use 47 * 195 joists. |
ns | The proposal has been identified as being in an area which may be affected by Radon. Once the work has been completed it is advisable that the property is tested in accordance with National Radiological Protection Board's recommendations. Any cracks in the floor slab, walls, or at service entries are to be suitably sealed with flexible sealers. A radon tray is to be provided at GF dpc level. |
ns | The elements of structure required to be protected so as to achieve a minimum of half an hour fire resistance. |
ns | Provide a layout plan showing the full details of the drainage system including runs, falls, invert levels, access and ventilation. Full details of manhole construction and size. |
ns | The minimum U value for the extension pitched roof - insulation at ceiling level is 0.15 W/m2K. Increase the insulation thickness or provide a u value calculation. |
Enw'r ffeil | Dyddiad a grëwyd | |
---|---|---|
Building Control Documents | ||
Completion Certificate | 17/10/2016 | |
Decision Notice | 03/08/2015 |