Croeso i
Gyngor Bro Morgannwg

Manylion am Gais Rheoli Adeiladau ar gyfer 2014/0008/PV



Rheoliadau Adeiladu Rhif
2014/0008/PV
Math y Cais
Partnership External Authority
Cyf Cynllunio
2014/00803/FUL
Penderfyniad
Approved Conditionally
Lleoliad
39, Victoria Road, Penarth
Dyddiad Dechrau
29/08/2014
Dyddiad Penderfynu
01/09/2014
Dyddiad Cwblhau
24/02/2015
Dyddiad Dilys
01/09/2014
Cynnig
Front extension
Penderfyniad
Approved Conditionally
Dyddiad Penderfynu
01/09/2014

Cod Manylion yr Amod
ns THE FOLLOWING COMMENTS ARE DERIVED FROM THE BUILDING REGULATIONS 2010: The outstanding conditions relating to this application are indicated below and you must submit the additional information detailed therein before these items can be discharged. A: STRUCTURE Confirm the maximum clear spans of all new roof and ceiling timbers. L1B (WALES): CONSERVATION OF FUEL AND POWER IN DWELLINGS Noted on specification reference to "Compliance to Part L 2014". Drawing reference directly from the new Approved Document L1B (Wales) the following minimum U-Values must be achieved. 1- Walls - 0.21 W/m²K 2- Roofs - 0.15 W/m²K 3- Slab / Floor - 0.18 W/m²K 4- Windows - 1.6 W/m²K or WER Band C 5- Doors - 1.6 W/m²K or DSER Band E It is important to note the "consequential improvement" requirements that are imposed on the existing dwelling. These could have an effect on the existing property and MUST be adhered to. Firstly note the comments in AD L1B (Wales) Section 4, page 15. For details on "Consequential improvement measures" see below references. For extensions under 10m² please refer to Approved Document L1B Wales pages 15 & 16, para 4.2.1 & 4.2.4. For extensions over 10m² refer to Approved Document L1B pages 15 & 16, para 4.2.2 & 4.2.4. Please provide details of your proposals to meet the criteria set out above. To access a copy of the relevant document please follow the below ; http://wales.gov.uk/topics/planning/?lang=en IMPORTANT CHANGES TO SEWER ADOPTION AND CONNECTION. On 1st October 2012 important changes came into force for any building and construction work that involves connection to the public sewerage network in Welsh Water's operating area. From that date a new adoption process, which is mandatory for all sewers and lateral drains connecting to the public sewerage system, and new construction standards set by the Welsh Ministers' for gravity foul sewers and lateral drains will come into force. These changes follow the transfer of private sewers on October 1st 2011, when ownership of the vast majority of private sewers and lateral drains which link with the public sewer network transferred to Welsh Water. This clarified the issue of ownership and maintenance. For further details please refer to the following:- www.dwrcymru.com - Sewer Adoption and Connection Leaflet Welsh Government Newsletter August 2012 and website With respect to this application and the Building Regulations Schedule 1 requirements of H1/H4, The Council has examined Dwr Cymru Welsh Water’s Map of Public Sewers (MoPS) in respects of any existing Sewerage Undertaker apparatus which may be built over by, or is within 3m of, the proposals. No such apparatus was indicated on the relevant MoPS and therefore Building Control does not have a responsibility to formally consult with the Sewerage Undertaker in respect of these proposals. However, private sewers and lateral drains are not currently shown on the MoPS and therefore, agreement/permission for the proposals in respects of any apparatus which is subsequently noted and/or exposed on site (but which is NOT currently shown on the MoPS) will need to be sought and obtained directly by the Applicant and/or Developer from Dwr Cymru Welsh Water and will not be pursued by the Council. The requirement for such an agreement sits outside the jurisdiction of the Building Regulations and therefore will not be a relevant consideration in the Councils Passing of Plans/Acceptance of Notices and will not be a relevant consideration in the Councils approval of works on site under H1 to H4. For information Dwr Cymru Welsh Water contact details are: Dwr Cymru/Welsh Water, Development Services, PO Box 3146, CF30 0EH Tel: 08009172652 Fax: 02920740472 Email: developer.services@dwrcymru.com
  Enw'r ffeil Dyddiad a grëwyd
Building Control Documents
Rydych chi yma:  
Cyngor Bro Morgannwg, Swyddfeydd Dinesig, Heol Holltwn, y Barri CF63 4RU, Ffôn: (01446) 700111