Planning Application Details for : 2015/00173/FUL

The timescale for submitting comments on this application has now expired.

Application Location
ABP Port of Barry, Atlantic Way, Barry
Easting
312836
Northing
167102
Proposal
Proposed solar photovoltaic system with an output of 10MW including raising of ground levels
Community Council
Barry Town Council
Application Type
Full Planning Application
Status
Application DETERMINED
Applicants Name
Associated British Ports,
Agents Name
ABP mer,
Applicant Address
Mr. Byron Lewis, Queen Alexandra House, Cargo Road, Cardiff. CF10 4LY
Agent Address
Ms Hannah Bodley, Quayside Suite, Medina Chambers, Town Quay, Southampton. SO14 2AQ
Other Details
Ms. E. L. Langmaid
Received
18/02/2015
Phone No
01446 704236
Validated
18/02/2015
Email
developmentcontrol@valeofglamorgan.gov.uk
Expires
15/04/2015
Decision Type
Delegated

Building Control Application
2018/0103/AI
Environmental Statement
Departure
Appeal
-
Decision
Approved
Decision Date
15/04/2015

Code Condition Details
AAA01 The development hereby permitted shall be begun before the expiration of five years from the date of this permission. Reason: To comply with the requirements of Section 91 of the Town and Country Planning Act 1990.
NSA Within 25 years and six months following completion of construction of the development, or within six months of the cessation of electricity generation by the solar photovoltaic facility, or within six months following a permanent cessation of construction works prior to the solar photovoltaic facil...
NS This consent shall relate to the plans registered on 18 February 2015 - Location Plan (Figure 1), Block Plan (Figure 2), December Updated Existing Levels (234-02-11.d11), Jan 2015 Proposed Levels (234-02-11.d12), Jan 2015 Proposed Phase 1 Levels (234-02-11.d13), Updated Cross sections with solar pa...
MAT02 Prior to the commencement of development, full manufacturers details and specifications of the proposed PV panels and their means of erection/support, shall be submitted to and approved in writing by the Local Planning Authority and the development shall thereafter be carried out in accordance with ...
AA079 All means of enclosure associated with the development hereby approved shall be in accordance with a scheme to be submitted to and agreed in writing by the Local Planning Authority prior to the commencement of development, and the means of enclosure shall be implemented in accordance with the approv...
NSA Prior to the commencement of development a detailed layout of the site including location of all PV panels, tracks and roads and all associated structures shall be submitted to and approved in writing by the Local Planning Authority and the development shall thereafter be carried out in accordance w...
NSA Prior to the commencement of development details of all proposed and existing lighting within the site including levels of light spill shall be submitted to and approved in writing by the Local Planning Authority and the development shall thereafter only be carried out in accordance with the approve...
ARC02 No development approved by this permission shall commence until the applicant, or their agents or successors in title, has secured the implementation of a programme of archaeological work in accordance with a written scheme of investigation which shall be submitted by the applicant and approved in w...
NSA An Ecological Management Plan (EMP) shall be been submitted to and approved in writing by the local planning authority prior to the commencement of any works within the site (including site clearance and re-profiling of any land forms). The content of the EMP shall include, but not exclusively limit...
NSA Notwithstanding the submitted plans, a comprehensive landscaping scheme shall be submitted in relation to landscaping of the existing and proposed bunds (and areas to be retained for reptile mitigation) to be approved in writing by the Local Planning Authority. Reason: To safeguard local visua...
NSA All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the completion of the development, whichever is the sooner; and any trees or plants which within a period of five years from the completion of th...
NSA Prior to the commencement of any development (including site clearance and re-profiling of any land) a contaminated land survey shall be conducted on the land between the former coal yard and the inert waste recycling site. As a minimum, at least 5 further trial pits should be sampled on the above s...
NSA Following completion of any remediation at the site, a verification report shall be submitted to and approved in writing by the Local Planning Authority and shall include details of the completed remediation works to show that the works have been carried out in full and in accordance with the approv...
NSA In the event that contamination is found at any time when carrying out the approved development, that was not previously identified, it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken and where remediation is necessary ...
CON5 No Development shall take place until there has been submitted to, approved in writing by the Local Planning Authority a Construction Environmental Management Plan (CEMP). The CEMP shall include details of how noise, lighting, dust and other airborne pollutants, vibration, smoke, and odour from con...
NS Prior to the construction/erection of the PV panels or their supporting structures, further plans/details shall be submitted to and approved in writing to demonstrate that the proposed development will not adversely impact upon the integtrity of the lanfdill capping layer and will not result in any ...
Name Date Sent Type Expiry Date
Barry Town Council 27/02/2015 Consult -
Barry Town Council 16/04/2015 Decision -
Cardiff Airport (Safeguarding) 27/02/2015 Consult -
CastlelandWrd1 27/02/2015 Consult -
CastlelandWrd2 OBSOLETE 27/02/2015 Consult -
Heneb, The Trust for Welsh Archaelogy (GGAT) 27/02/2015 Consult -
Highway Development, 27/02/2015 Consult -
Natural Resources Wales, 27/02/2015 Consult -
Shared Regulatory Services (Pollution) 27/02/2015 Consult -
Address Date Sent Reconsult Date Expiry Date
Barry Town Council 7, Gladstone Road Barry CF62 8NA - - -
ASSOCIATED BRITISH PORTS BARRY PILOT STATION DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
BARRY LICENSED BOATMEN LADY WINDSOR LOCK DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
BARRY OUTLET HARBOUR DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
7MARINE FLAT HOLM PROJECT DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
UNIT 14 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
PART 1 UNIT 14 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
CASS SALES & HIRE LTD UNIT 15C ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 16 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 14E ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
A AND L SCRAPMETAL LTD UNIT 14E ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
A P C PANELS LTD ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
HAWTHORN TRAVEL LTD 2 ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
PORT OFFICE ATLANTIC WAY BARRY CF63 3US 27/02/2015 - 20/03/2015
GRAYPEN LTD ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
GROUPE SAMAT UK LTD ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
BARRY AUTO ENGINEERING ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
UNIT 3 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
DG WINDOW SERVICES LTD UNIT 5 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 7 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 9 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 12 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
NICK'S AUTO REPAIRS UNIT 12D ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 14 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 16 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
INSTALL SKIP HIRE LTD UNIT 12F ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 21 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
PIERHEAD BARRY OUTLET HARBOUR DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
LADY WINDSOR LOCK DOCK ROAD BARRY CF62 5QS 27/02/2015 - 20/03/2015
CONCRETE DESIGN CENTRE UNIT 13A ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 19 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 15 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 14B ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
PART 2 UNIT 14 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
ACE SERVICES UNIT 14D ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
ASSOCIATED BRITISH PORTS DOCKS HEREDITAMENT ATLANTIC WAY BARRY CF63 3US 27/02/2015 - 20/03/2015
SALEVON LTD ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
THE STONEYARD ATLANTIC CRESCENT BARRY CF63 3RA 27/02/2015 - 20/03/2015
C SHED ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
CASS HIRE AND SALES LTD UNIT 15B ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
TOTAL CULVERT SOLUTIONS LTD UNIT 1 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 2 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
BARRY MARINE CADETS UNIT 4 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 6 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 8 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 10 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 11 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 13 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 15 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 17 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 18 ARCADE WORKSHOPS ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 12E ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
SPARTAN ENGINE & PLANT REPAIRS LTD UNIT 16 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
ATLANTIC VEHICLE REPAIRS UNIT 12C ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 12B PART 2 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
UNIT 12B PART 1 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
O'CONNOR'S S&P BUILDING SERVICES UNIT 12E ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
S H S SCAFFOLDING UNIT 15 ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
D B ENGINEERING UNIT 12 ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
STITCH IN TIME INDUSTRIAL SEWING ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
SCOTT PALLETS A SHED ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
CJ CONTRACT TRAVEL SERVICES LTD FIRST REACH COMPOUND ATLANTIC WAY BARRY CF63 3US 27/02/2015 - 20/03/2015
GREEN CIRCLE SUSTAINABLE DEVELOPMENT LTD ATLANTIC CRESCENT BARRY CF63 3RA 27/02/2015 - 20/03/2015
CORINTHIAN STONEMASONRY LTD THE STONEYARD ATLANTIC CRESCENT BARRY CF63 3RA 27/02/2015 - 20/03/2015
A SHED ATLANTIC WAY BARRY CF63 3RA 27/02/2015 - 20/03/2015
INSTALL SKIP HIRE LTD UNIT 12H ATLANTIC TRADING ESTATE BARRY CF63 3RF 27/02/2015 - 20/03/2015
MILITARY ASSETS LTD UNIT 2A ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
MILITARY MOTORS LTD UNIT 2B ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
UNIT 2C ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
LEISURE SOLUTIONS LTD UNIT 1A ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
FAIR GAMES UK LTD UNIT 1B ATLANTIC CRESCENT BARRY CF63 3RG 27/02/2015 - 20/03/2015
  File name Created date
Planning Documents
Number Site or Press Description Display Date
1 - Application that may be of General Public Interest 05/03/2015
2 - Application that may be of General Public Interest 09/03/2015
Number Description
1 Civil Aviation Authority - All Applications over 15m
2 Civil Aviation Authority - All Applications over 45m
3 South Area Team
4 Flood Risk Zone B1
5 Flood Risk Zone C2
6 Surface Water Intermediate
7 Surface Water Less
8 2014/01089/FUL : Ports Office, Atlantic Way, Barry - Erection of a 10MW solar Photovoltaic system including levelling of land - Approved 19/12/2014 (case officer - SDB) 2014/00574/SC1 : Atlantic Way, Port of Barry, Barry - Solar Voltaic project 2 sites - Environmental Impact Assessment (Screening) - Not Required 11/06/2014 (case officer - MG) 1996/00939/FUL : Atlantic Way, Barry Dock - Inert recycling centre - Approved 04/04/1997 (case officer - JMC) 1992/01220/LAW : Site off Atlantic Way, Barry Docks - Installation of blending, screening and integrated washing plant - Finally Disposed of 12/09/2008 (case officer - LGJ) 1991/00901/FUL : Old refuse tip, off Atlantic Way, Barry Dock - Solid fuel depot for storage, handling, screening, washing and blending of coal for wholesale and retail sales - Refused 28/04/1992 (case officer - LGJ) 1987/00554/OUT : South of Atlantic Way, Barry Docks, Barry - Offices, garage workshops, pump houses, stores and ancillary buildings - Approved 13/07/1988 (case officer - RT)