AAA01 |
The development hereby permitted shall be begun before the expiration of five years from the date of this permission.
Reason:
To comply with the requirements of Section 91 of the Town and Country Planning Act 1990. |
NS |
This consent shall relate to the plans registered on the 18th December 2014, other than where amended by plans reference P_200A, P_201A, P_202A, P_300A, P_301B and P_400A received on the 20 January 2015.
Reason:
To ensure a satisfactory form of development and for the avoidance of doubt as to ... |
NS |
Prior to the commencement of development, details of the finished levels of the site and dwelling in relation to existing ground levels and the level of adjoining land shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out in full accor... |
NS |
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2013 and the Town and Country Planning (General Permitted Development) Order 1995, (or any Orders revoking or re-enacting those Orders with or without modification), no gates, fe... |
NS |
Notwithstanding the submitted plans, all means of enclosure associated with the development hereby approved shall be in accordance with a scheme to be submitted to and agreed in writing by the Local Planning Authority and the means of enclosure shall be implemented in accordance with the approved de... |
NS |
A landscaping scheme shall be submitted to and approved in writing by the Local Planning Authority which shall include indications of all existing trees and hedgerows on the land and details of any to be retained, together with measures for their protection in the course of development.
Reason:
... |
AA090 |
All planting, seeding or turfing comprised in the approved details of landscaping shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is the sooner; and any trees or plants which within a period of f... |
NS |
Foul water and surface water discharges shall be drained separately from the site, with no surface water or land drainage run-off allowed to connect (either directly or indirectly) into the public sewerage system.
Reason:
To protect the integrity, and prevent hydraulic overloading, of the Publ... |
NS |
Notwithstanding the submitted plans, the planning permission hereby granted does not include permission for any works to culvert the watercourse running through the application site.
Reason:
For the avoidance of doubt as to the extent of the approved development and to ensure compliance with P... |
NS |
Notwithstanding the submitted plans and prior to their use in the construction of the dwelling hereby approved, further details and samples of the external materials to be used on the dwelling shall be submitted to and approved in writing by the Local Planning Authority and the development shall the... |
NS |
Notwithstansding the submittd plans and prior their construction, further details of all windows, doors, eaves, any fascias/barge boards and rainwater goods (to include sections) shall be submitted to and approved in writing by the Local Planning Authority and the development shall be carried out an... |
NS |
No Development shall take place until there has been submitted to, approved in writing by the Local Planning Authority a Construction Environmental Management Plan (CEMP). The CEMP shall include details of how noise, lighting, dust and other airborne pollutants, vibration, smoke, and odour from con... |
ARC01 |
The developer shall ensure that a suitably qualified archaeologist is present during the undertaking of any ground disturbing works in the development area so that an archaeological watching brief can be conducted. The archaeological watching brief shall be undertaken to the standards laid down by t... |
NS |
The development hereby approved shall be carried out in strict accordance with the measures contained in the G. F. Thomas Merlin Bio-Surveys Report of July 2014 and these mitigation measures shall be completed in full prior to the first beneficial use of the building, and thereafter retained at all ... |